Eventos Anais de eventos
COBEM 2017
24th ABCM International Congress of Mechanical Engineering
5 MW and 2 MW NREL wind turbines simulation comparison for steady loading calculations
Submission Author:
Augusto Antônio Coutinho Silva , PE , Brazil
Co-Authors:
Cristiano Leal dos Santos, Samia Diogenes, Alex Maurício Araújo, Eduardo Corte Real Fernandes, Ciro Cordeiro de Araujo Bezerra, WENIO FHARA ALENCAR BORGES, Eduardo Coutinho Calheiros, Lucas Iolanda de Andrade, Candido Requião Ferreira, Augusto Antônio Coutinho Silva
Presenter: WENIO FHARA ALENCAR BORGES
doi://10.26678/ABCM.COBEM2017.COB17-0834
Abstract
This paper aims to study the standard behavior of the VSVP (Variable Speed Variable Pitch) NREL 2 MW and NREL 5 MW wind turbines, analyzing and comparing the performance of these turbines in relation to the wind velocity and pitch forces in steady state condition. In this work, a bibliographical revision was elaborated and a computational tool, G.H. Bladed 4.5, was employed in order to analyze the steady state calculations between the two turbines. The results obtained were consistent in the sense of identifying the characteristic pattern of the behavior of the VSVP turbines.
Keywords
wind energy, load simulations, steady simulations comparison, GH Bladed

