|
S4 Ciências e Engenharia do Petróleo |
|
Title:
|
LAB-WELL AND TRAINING FACILITY 9-PE-2-TQ-BA – CETRE/TAQUIPE:
NEW CONFIGURATION
|
|
Summary :
|
THE CURRENT CONFIGURATION OF WELL 9-PE-2-TQ-BA, ALONG WITH ITS INSTRUMENTATION FROM BOTTOM HOLE TO SURFACE IS DESCRIBED. THE PRIMARY EQUIPMENT AND REQUIRED ACCESSORIES FOR THE EXPERIMENTS ALREADY PERFORMED AS WELL AS THOSE THAT ARE PLANNED FOR THE FUTURE IS ALSO SHOWN. ADDITIONALLY, THE DATA ACQUISITION SYSTEM, HARDWARE AND SOFTWARE, FUNDAMENTAL FOR REAL TIME MONITORING OF KEY PARAMETERS AND ACTUATION OF THE AUTOMATIC SYSTEMS IS SHOWN.
PREVIOUS EXPERIMENTAL WORK PERFORMED USING THE WELL IS DESCRIBED, ALONG WITH A BRIEF SUMMARY OF THE CHARACTERISTICS OF EACH STUDY. FUTURE EXPERIMENTAL WORK PLANNED USING THE TAQUIPE TEST WELL IS ALSO NOTED. THIS PAPER CLEARLY ILLUSTRATES THE MAIN ADVANTAGES OF THIS WORK FOR THE COMPANY.
KEY-WORDS: LAB-WELL, DRILLING HYDRAULICS, WELL CONTROL, LIGHT-WEIGHT FLUIDS DRILLING.
|
|
Author :
|
de Andrade Jr., Paulo Hora
Nakagawa, Edson Yoshihito
Silva Jr., Valter 0
Vidal, José Luiz Arias
|
|
Paper View :
|
|
COBEM99
| Organizing Committee | Keynotes
| Technical
Sessions | Author
| Symposia and special sessions
| Referees |
Work
Titles | Venue
|