S13  Integridade Estrutural
 
 Title:
PWR STEAM GENERATORS TUBE INTEGRITITY: PLUGGING CRITERIA FOR PWSCC IN ROLL TRANSITION ZONE
 
Summary :
ONE OF THE MOST IMPORTANT CAUSES FOR TUBE PLUGGING IN PWR (PRESSURIZED WATER REACTOR) STEAM GENERATORS IS THE DEGRADATION MECHANISM CALLED PRIMARY WATER STRESS CORROSION CRACKING (PWSCC) IN ROLL TRANSITION ZONE (RTZ) NEAR THE TUBESHEET, MAINLY FOR ALLOY 600 TUBES. TO AVOID AN EXCESSIVE TUBE PLUGGING, ALTERNATIVE CRITERIA HAVE BEEN DEVELOPED BASED ON AN APPROACH THAT CONSISTS IN WITHDRAWING FROM SERVICE ANY TUBE CONTAINING A DEFECT FOR WHICH THERE IS A HIGH PROBABILITY OF A CRITICAL SIZE UNDER ACCIDENT CONDITIONS TO BE REACHED DURING NEXT OPERATION CYCLE. PREDICTIONS OF THE NUMBER OF TUBES TO BE PLUGGED CAN BE DONE AIMING AT PREVENTIVE MAINTENANCE AND TUBE REPAIR, AND EVEN A STEAM GENERATOR REPLACEMENT, WITHOUT A LARGE AND NON-PLANNED PLANT OUTAGE. THIS WORK PRESENTS IMPORTANT ASPECTS RELATED TO TUBE PLUGGING CRITERIA FOR PWSCC IN RTZ BASED ON THE RISK OF BREAK AFTER A LEAK DETECTION. CALCULATIONS OF ALLOWABLE CRACK LENGTH AND ALLOWABLE LEAK RATE FOR A PARTICULAR SITUATION ARE ALSO SHOWN. KEYWORDS: STEAM GENERATOR, STRUCTURAL INTEGRITY, TUBE, STRESS CORROSION CRACKING 
 
Author :
Cruz, Julio R. B.
Mattar Neto, Miguel 0
 
 
Paper View :

 

COBEM99 | Organizing Committee | Keynotes | Technical  Sessions | Author | Symposia and special sessions | Referees
Work  Titles | Venue